A grid scaled to the ground, and where it stops being one. A surface coordinate system on the British National Grid: the grid multiplied by 1.0004044, the reciprocal of the combined factor at a project origin 120 m above the ellipsoid, so that a grid distance equals a ground distance there. It is exact at the origin by construction and wrong everywhere else, and the two directions are not comparable — the axis is logarithmic across five decades. 60 km due east the set-out distance is out by 5559 mm, and the same distance due north by 20.5 mm. The scale factor of a transverse Mercator depends on the easting and almost not at all on the northing, so a system sold as good "within a few kilometres" has a useful area that is a strip rather than a circle.

A grid scaled to the ground is not a map

Construction sites work in coordinates where a tape reading equals a computed distance, which is achieved by multiplying the national grid by a constant. The result is exact at one point, degrades east–west forty times faster than north–south, and is not a map projection at all.

practice · Grid
Three surfaces, and the two heights between them. The ellipsoid, the geoid and the ground, with the two heights a coordinate can carry. Ellipsoidal height h is what a satellite fix returns and is measured from a surface defined by four constants. Orthometric height H is what a level and a staff measure and is referred to the geoid — the equipotential surface that best fits mean sea level. They differ by the separation N, drawn here as 45 metres because that is a stated input rather than a computed one: a geoid model is a data product with a truncation degree in it, and this site computes rather than downloads. The arithmetic h = H + N is exact whatever N is.

Height above what?

A satellite reports a height above a mathematical surface. A level and a staff report a height above the surface water settles on. The two disagree by tens of metres, both are correct, and only one of them decides which way a pipe drains.

datums · Height
Four steps between a tape and a drawing. A slope distance of 76.895 km measured at 3.2° on ground 220 m above sea level, reduced to the British National Grid, with every step drawn on a logarithmic scale in millimetres. The slope reduction is the largest by a wide margin at 119.90 m and is the one everybody applies. The grid reduction is 30.23 m. The fourth bar is not a step at all: it is what using the levelled height where the height above the ellipsoid is wanted costs, with a geoid separation of 48.5 m — 583 mm, which is 1.9% of the grid reduction it sits beside and 29 times the tolerance the job closes to. Reading a correction's importance off its share of the chain is how it gets dropped.

What a tape measures

Four steps stand between an instrument reading and a coordinate, and their sizes are not in the order anybody expects. On a 77-kilometre line the slope reduction is 120 metres, the grid reduction 30, and a step nobody names — using the height above sea level where the height above the ellipsoid is wanted — is 583 millimetres.

practice · Reduction
The route at height does not lie above the route on the ground. London to Tokyo, solved at the surface and again at a stated height, with the two ground tracks compared point for point. At a cruising altitude of eleven kilometres the two part by 11.8 metres; the departure is proportional to the height, at a fitted slope of 0.997. On a sphere the same measurement returns 2.7e-9 metres, because the offset of a sphere is a sphere and the two geodesics coincide exactly. The offset of an ellipsoid is not an ellipsoid, and this is what that costs.

The shortest route is not at sea level

Ten rungs route on a surface and nothing is ever flown on one. The offset of a sphere is a sphere, so at altitude the great circle is the great circle. The offset of an ellipsoid is not an ellipsoid — its radii of curvature are M + h and N + h, which belong to no ellipsoid — so the shortest route at cruising height does not lie above the shortest route on the ground.

paths · Paths
The two reductions, at a grid factor of 1.0004. A measurement made on the ground has to be brought to the ellipsoid and then to the grid, and the two corrections have opposite signs. The elevation factor is R/(R+h) and always shrinks; the grid factor here is 1.0004, which stretches. Their product is the only number a surveyor can use. They cancel exactly at 2551 metres. At 1500 metres the combined factor is 165 parts per million, which is 1.65 metres on a 10 kilometre baseline.

The ground is not the grid

A tape measure on a hillside has to be brought down to the ellipsoid and then out onto the map, and the two corrections have opposite signs. On a grid whose scale factor exceeds one there is exactly one elevation where they cancel — 2,551 metres, for a factor of 1.0004.

datums · Height
The same coordinate on four datums. One pair of numbers — 2.0° west, 54.5° north — read as a coordinate on OSGB36, ED50, NAD27 and on WGS84, and plotted where each reading puts the mark on the ground. The spread runs to 195 metres, and the height changes by 51, 44, 47 metres, which is the component nobody quotes.

The third coordinate moves too

A datum shift is quoted as a horizontal displacement because horizontal is what people look at. The transformation acts on a three-dimensional point, and its vertical component is between a quarter and a half of the horizontal one — 51 metres, for a British coordinate.

datums · Height
Which corrections a 10 mm job may leave out. Each correction inverted: the line length — or, for the last row, the patch radius — at which that correction alone reaches 10 mm, for a job 150 m above the ellipsoid on 2° of ground, 0.0° from the British National Grid's central meridian. The tightest is the slope reduction at 16 m. Three of the four rows are linear in the tolerance, so this ranking is the same at a millimetre and at a decimetre; what does change it is the site — move the job up a mountain or onto steeper ground and the order is different, which is why a specification's list is not transferable.

The tolerance decides the model

Every correction inverts to a distance — the line length at which it alone exceeds a stated tolerance. The ranking those distances produce is the same at a millimetre and at a decimetre, and it is different for two jobs at the same tolerance on different ground.

practice · Reduction
One level surface, 1000 m up at the equator, in two height systems. A single equipotential surface — the shape a body of water takes — with the number each height system gives it, all the way from the equator to the pole. The orthometric height, which is the distance up the plumb line and therefore a length, falls by 5.28 metres along it, because level surfaces converge polewards. The dynamic height, which is the geopotential number divided by one constant gravity value, is flat to 0.000 millimetres — it is the same number everywhere on the surface, and it is not a distance from anything.

A height that is not a length

Level surfaces converge polewards, so the surface a lake sits on is 5.28 metres lower at the pole than at the equator and a height system that reports lengths says a lake runs downhill. The fix reports a number that is constant on the surface and is not a distance from anything: a hundred-metre climb raises it by 99.73 metres at the equator and 100.26 at the pole.

datums · Height
Two routes to one grid distance, 76.7 kilometres apart. The first four bars are the tape's chain: the chord between two marks, the height difference taken off it, the reduction to the ellipsoid, and the projection's own scale applied. The last is the satellite route — project both marks and subtract — which needs none of those steps because the observation already contains the positions the chain exists to supply. They agree to 0.17 millimetres, and that agreement is what makes the chain checkable at all: two routes to one number, sharing no arithmetic.

The chain the satellite does not have

The four-step reduction from a tape reading to a grid coordinate exists because a tape does not know where it is. A satellite observation does, so the same distance can be got by projecting both ends and subtracting — and the two answers agreeing to a fifth of a millimetre is the first check the chain has ever had.

practice · Reduction
A compacting basin, and the tilt it produces. The stated vertical velocity field — a bowl of subsidence 120 km across, with no mass leaving — drawn as circles proportional to the rate, with the tilt of the ground surface as the arrows. The subsidence is largest at the centre and the tilt is exactly zero there, because a smooth bowl has no gradient at its own bottom. The largest tilt is 125.5 nanoradians a year, on a ring at the bowl's own scale length over root two, and it is the quantity a levelling network measures.

A vertical rate needs a height system

Four rungs of this anchor measure the two-by-two horizontal tensor, because that is what a tangent chart returns. The larger signal in a subsiding basin is vertical — 126 nanoradians a year of tilt against 0.76 nanostrain a year of horizontal strain — and it is not a measurement at all until the surface it is measured against is named, because that surface is moving too.

datums · Strain
Millimetres of horizontal move per kilometre of assumed height. How far the transformed latitude and longitude move when the height fed into a datum transformation changes by one kilometre, for four published transformations at five places. It runs from 7.7 to 121 millimetres per kilometre. A latitude and a longitude do not carry a height, so a two-dimensional coordinate cannot be transformed until somebody supplies one that is not in it.

The height a coordinate does not carry

Ten rungs treat a datum shift as a map from one pair of angles to another. It is not one: the transformation runs through Cartesian coordinates, so the answer depends on the height — by 7.7 to 121 millimetres per kilometre depending on the datum and the place, which puts Lhasa 432 millimetres from where a height of zero would have said.

datums · Datum

Named alongside it

The objects these essays reach for when they reach for this one.

ToleranceVerificationGeoidOrthometric heightScale factorCombined factorNational GridPurposeRadius of curvatureVertical datumConventionDatum

All concepts