Concept

Combined factor — where it appears

The product of a grid's point scale factor and the correction from the ground to the ellipsoid, which is what a survey multiplies a measured distance by. The two halves pull in opposite directions and cancel at one elevation, which is a fact about a place rather than about the grid.

Named by 6 essays across 2 fields — each of them below, with the objects they name alongside it.

A grid scaled to the ground, and where it stops being one. A surface coordinate system on the British National Grid: the grid multiplied by 1.0004044, the reciprocal of the combined factor at a project origin 120 m above the ellipsoid, so that a grid distance equals a ground distance there. It is exact at the origin by construction and wrong everywhere else, and the two directions are not comparable — the axis is logarithmic across five decades. 60 km due east the set-out distance is out by 5559 mm, and the same distance due north by 20.5 mm. The scale factor of a transverse Mercator depends on the easting and almost not at all on the northing, so a system sold as good "within a few kilometres" has a useful area that is a strip rather than a circle.

A grid scaled to the ground is not a map

Construction sites work in coordinates where a tape reading equals a computed distance, which is achieved by multiplying the national grid by a constant. The result is exact at one point, degrades east–west forty times faster than north–south, and is not a map projection at all.

practice · Grid
Four steps between a tape and a drawing. A slope distance of 76.895 km measured at 3.2° on ground 220 m above sea level, reduced to the British National Grid, with every step drawn on a logarithmic scale in millimetres. The slope reduction is the largest by a wide margin at 119.90 m and is the one everybody applies. The grid reduction is 30.23 m. The fourth bar is not a step at all: it is what using the levelled height where the height above the ellipsoid is wanted costs, with a geoid separation of 48.5 m — 583 mm, which is 1.9% of the grid reduction it sits beside and 29 times the tolerance the job closes to. Reading a correction's importance off its share of the chain is how it gets dropped.

What a tape measures

Four steps stand between an instrument reading and a coordinate, and their sizes are not in the order anybody expects. On a 77-kilometre line the slope reduction is 120 metres, the grid reduction 30, and a step nobody names — using the height above sea level where the height above the ellipsoid is wanted — is 583 millimetres.

practice · Reduction
A closed traverse cannot see a scale error. The same closed figure with two different errors in it. On the left every leg is 400 parts per million too long, which is roughly what forgetting the grid scale factor costs — and the figure closes to 2.3e-13 m, which is the last bit of a double rather than a measurement. Scaling every leg of a closed figure by the same factor produces a similar figure and a similar figure is still closed, so the check every specification leans on is blind to it. Every dimension in that figure is wrong: the perimeter is out by 1.17 m. On the right one angle is 20 seconds out — a far smaller disturbance in its own units — and the figure fails to close by 0.062 m. Closure tests the shape and says nothing about the size.

A traverse must close

The check every survey specification leans on cannot see the error this whole field is about. Scale every leg of a closed figure by four hundred parts per million and it closes to the last bit of a double, while every dimension in it is wrong.

practice · Reduction
The two reductions, at a grid factor of 1.0004. A measurement made on the ground has to be brought to the ellipsoid and then to the grid, and the two corrections have opposite signs. The elevation factor is R/(R+h) and always shrinks; the grid factor here is 1.0004, which stretches. Their product is the only number a surveyor can use. They cancel exactly at 2551 metres. At 1500 metres the combined factor is 165 parts per million, which is 1.65 metres on a 10 kilometre baseline.

The ground is not the grid

A tape measure on a hillside has to be brought down to the ellipsoid and then out onto the map, and the two corrections have opposite signs. On a grid whose scale factor exceeds one there is exactly one elevation where they cancel — 2,551 metres, for a factor of 1.0004.

datums · Height
Which corrections a 10 mm job may leave out. Each correction inverted: the line length — or, for the last row, the patch radius — at which that correction alone reaches 10 mm, for a job 150 m above the ellipsoid on 2° of ground, 0.0° from the British National Grid's central meridian. The tightest is the slope reduction at 16 m. Three of the four rows are linear in the tolerance, so this ranking is the same at a millimetre and at a decimetre; what does change it is the site — move the job up a mountain or onto steeper ground and the order is different, which is why a specification's list is not transferable.

The tolerance decides the model

Every correction inverts to a distance — the line length at which it alone exceeds a stated tolerance. The ranking those distances produce is the same at a millimetre and at a decimetre, and it is different for two jobs at the same tolerance on different ground.

practice · Reduction
A 1-hectare parcel across British National Grid, at 52°N. The departure of a plan's dimensions from the ground's, across the width of the zone, as a length and as an area. The area curve is the length curve doubled — an areal scale factor is the square of a linear one, and squaring a small departure doubles it — so a parcel whose sides are each 399 parts per million short on the central meridian is 797 short in area. On a 1-hectare parcel that is 8.0 square metres at the central meridian and 8.0 at 0.00° out.

An area on the grid is not an area on the ground

A grid's scale factor is a property of lengths and what a surveyor sells is an area. Squaring a departure doubles it, so a hectare drawn on the British grid at its central meridian has 10,008 square metres of ground under it — and correcting an area with the line factor instead of its square leaves half the error behind.

practice · Grid

Named alongside it

The objects these essays reach for when they reach for this one.

National GridScale factorToleranceEllipsoidal heightLine scale factorVerificationConventionPurposeRadius of curvatureGeoidRepresentative fractionTrade-off