Compilation — where it appears
Named by 2 essays across one field — each of them below, with the objects they name alongside it.
A copy eased into place loses its seams before its source
A stretch of coast lifted from another sheet and dropped in rigidly leaves two sharp corners where it joins, and both of them are findable. A compiler does not work that way: they pin the ends and ease the middle until it looks continuous. Easing halves the corner within five per cent of the outline and the seams survive it — until forty per cent, where the located seam jumps from four per cent of the coast out to twenty. The source projection survives twice as far, to seventy-five. The piece goes on naming where it came from after the method has lost track of which piece it is.
A residual cannot count the pieces of a map
A compiled map does not say how many sheets went into it, and trying every count and keeping the best fit cannot tell. Seven pieces always fit better than two, because they contain them. A criterion that charges ln N for each number a piece spends recovers the true count in every trial, for one copied stretch and for two, until the digitising error reaches a thousandth of the map. AIC charges two and takes every piece it is offered. And an eased copy defeats the right criterion the other way: it is not a projection, so BIC buys pieces to explain it, three seams, then four, then six.
Named alongside it
The objects these essays reach for when they reach for this one.
EstimatorProjection identificationResidualSeamSimilarityDegrees of freedomDigitisingLeast-squaresOutlineSearchToleranceVerification