The thread: Purpose before property — page 2
The units are part of the coordinate
Two feet were in use in the United States until 2022, differing by exactly two parts per million. A plan drawn in the wrong one has every dimension right to a fifth of a millimetre and sits three-quarters of a metre from where it belongs, which is why it passes every check anybody runs.
Geodesics on the ellipsoid, and why they are hard
The shortest path on a flattened Earth is not a plane curve, has no closed form, and can be longer or shorter than the spherical answer depending on which way it runs. Every practical method is a series or an iteration, and the correction changes sign.
Giving up continuity
Cutting a map into lobes really does reduce the distortion, by a factor that can be measured. What is paid is that the map stops being one surface — and the size of the tear is the number that pictures of interrupted maps never carry.
Fitting the aspect to the region
Choosing a projection is a choice among a few dozen named things. Choosing its aspect is a choice among a continuum, it costs nothing, it changes none of the projection's own properties, and for a long thin country it is worth a factor of 183.
The projections that gave up being one thing
The polyconic is built from a different cone for every parallel, which means it is built from no cone at all. It preserves nothing the usual tests look for, it has an exact property neither of them measures, and its sheets do not fit together — a defect discovered in the field rather than at the drawing board.
Distortion over a region
An indicatrix describes a point and every practical question is about a country. Going from one to the other means integrating, integrating means choosing a weighting, and the weighting is the step that turns a measurement into somebody's opinion.
Datum shifts dwarf projection errors
The projection argument is conducted in parts per million and the datum question is answered in hundreds of metres. A coordinate whose datum is unstated is out by more than any projection choice could ever put it, and almost nobody checks.
Designing a grid for one region
A country with a grid of its own beats the international zone that would otherwise carry it by a factor of 1.51. That is worth having and it is much less than the argument is usually made to sound, and the difference between the two numbers is the whole case for and against national grids.
The pyramid did not have to be Mercator
The usual defence is that a quadtree needs a square world and Mercator supplies one. So does the cylindrical equal-area with standard parallels at ±55.654° — the solution of π cos²φ₀ = 1 — and it needs no polar cut at all. What Mercator actually buys is conformality, and the price of giving it up is 13.8° of shear at 60° north.
The plate carrée, the projection nobody chooses
Plotting latitude against longitude on ordinary axes is a projection. It preserves nothing, its angular deformation reaches 108° and its areal error eightfold, and it is probably the most widely produced map in the world because it is what happens when nobody decides anything.
Flying a curve in straight legs
Nobody steers a great circle, because a great circle requires the heading to change continuously. What is actually flown is a handful of constant-heading legs between waypoints on it, and the gap between plan and curve falls as the square of the number of legs.
Choosing for a line, not a region
Every criterion in this subject integrates over an area. A pipeline, a railway or a coastal survey is a curve, and the projection an area criterion picks for it is not the one it should have — measurably, by a factor of five thousand.
The epoch is part of the coordinate
A latitude and a longitude with no date on them are incomplete, because the ground they refer to is moving at between ten and seventy millimetres a year. Australia crosses an ordinary survey tolerance in under two years and moved 1.8 metres between two versions of its own datum.
A route that must go round
Every route on this site so far has been free to go anywhere, and no real route is. The shortest path past a circular exclusion is two tangent great circles and an arc of the rim — a closed form that agrees with a shortest-path search to three metres in 9,598 kilometres — and it costs not the obstacle's size but the square of how far the obstacle reaches past the route.
Where a pseudocylindrical puts its error
Every projection in this family has to decide what to do at the pole, which on the globe is a point where every meridian meets. Drawing it as a point and drawing it as a line are the two answers, and the trade between them is measurable in both directions.
A grid scaled to the ground is not a map
Construction sites work in coordinates where a tape reading equals a computed distance, which is achieved by multiplying the national grid by a constant. The result is exact at one point, degrades east–west forty times faster than north–south, and is not a map projection at all.
Height above what?
A satellite reports a height above a mathematical surface. A level and a staff report a height above the surface water settles on. The two disagree by tens of metres, both are correct, and only one of them decides which way a pipe drains.
How many sheets an atlas needs
A tolerance on the scale error inverts, through Chebyshev's bound, into a sheet radius — and a covering problem turns the radius into a count. One part in a thousand costs 1,210 sheets of 403 kilometres radius, the count goes as the reciprocal of the tolerance exactly, and the projection multiplies it by anything from one to fifty-six.
Equal-area on the wrong body
The site's headline is that Web Mercator puts geodetic latitudes into a spherical conformal formula and stops being conformal. The same sentence is true with "equal-area" in it and nobody says it: the areal factor is 1.00674 at the equator, 0.99332 at 88°, and averages to almost exactly one — so every check that adds up areas passes while every cell is wrong.
Grid north is not north
A grid has one north, parallel everywhere on the sheet by construction. The Earth has a different one at every point. The angle between them reaches two degrees at the edge of a UTM zone, and a straight line on the grid is not a straight line on the ground either.
The quickest route is not the shortest
Every route on this site so far is in a medium that does nothing, so length and time are the same question divided by a constant. Once the water moves, they are different questions with different answers: the quickest track sails five per cent further and arrives eleven per cent sooner, and the journey back takes four times as long as the journey out.
What a tape measures
Four steps stand between an instrument reading and a coordinate, and their sizes are not in the order anybody expects. On a 77-kilometre line the slope reduction is 120 metres, the grid reduction 30, and a step nobody names — using the height above sea level where the height above the ellipsoid is wanted — is 583 millimetres.
A traverse must close
The check every survey specification leans on cannot see the error this whole field is about. Scale every leg of a closed figure by four hundred parts per million and it closes to the last bit of a double, while every dimension in it is wrong.
A projection written as a condition
Instead of a formula, a sentence: the distance from these two places must be exactly right. The map that satisfies it is found by intersecting two circles, it is exact to five parts in a hundred million million, and it exists over the whole sphere for a reason that belongs to the sphere rather than to the construction.