Plumb line — where it appears
Named by 3 essays across 2 fields — each of them below, with the objects they name alongside it.
How far the plumb line bends
An earlier measurement dropped a plumb line down a four-kilometre column of rock beside one buried mass and found it arrived 47 millimetres from the point below the summit. That is a number about that mass. Parameterising by the deflection of the vertical instead — the quantity surveyors actually measure — gives 12.54 mm per arcsecond, exactly linear across a fortyfold range.
A mountain is not a buried sphere
The plumb line's drift was measured over a compact buried body and grows as the 0.69 power of the column's height — an exponent that is a statement about how quickly a buried sphere's field weakens with distance rather than about mountains. Spread the same mass into a crustal root and the exponent climbs to 0.84, while the proportionality to the deflection survives exactly.
A levelling loop reads the circulation, and the geoid has none
A triangle of angles reads the geoid as the flux of the deflection of the vertical through its sides. A levelling loop is the other integral round the same curve, the circulation, and at the geoid that one is identically zero, because the deflection is the slope of a height. What a levelling loop run on the ground misses by is the Jacobian of gravity and height over the loop: 31 mm round a fifty-kilometre loop in a stated mountain range, none of it from the free-air gradient that changes gravity by 1,333 mGal there, uncorrelated with what the triangle reads, and two and a half times the noise of the levelling where the triangle's reading is a fiftieth of its own.
Named alongside it
The objects these essays reach for when they reach for this one.
Deflection of the verticalLevellingOrthometric heightGeoidGeopotential numberVertical datumConvergence orderDensityGauss–Bonnet theoremGravityGravity anomalyJacobian