Figure

Which corrections a 10 mm job may leave out

Drawn here at the parameters it defaults to, with every essay that calls it.
Which corrections a 10 mm job may leave out. Each correction inverted: the line length — or, for the last row, the patch radius — at which that correction alone reaches 10 mm, for a job 150 m above the ellipsoid on 2° of ground, 0.0° from the British National Grid's central meridian. The tightest is the slope reduction at 16 m. Three of the four rows are linear in the tolerance, so this ranking is the same at a millimetre and at a decimetre; what does change it is the site — move the job up a mountain or onto steeper ground and the order is different, which is why a specification's list is not transferable.

Each correction inverted: the line length — or, for the last row, the patch radius — at which that correction alone reaches 10 mm, for a job 150 m above the ellipsoid on 2° of ground, 0.0° from the British National Grid's central meridian. The tightest is the slope reduction at 16 m. Three of the four rows are linear in the tolerance, so this ranking is the same at a millimetre and at a decimetre; what does change it is the site — move the job up a mountain or onto steeper ground and the order is different, which is why a specification's list is not transferable.

It is drawn by survey-figure with show: "tolerance-table" — one member of a family of 16 figures that share a generator, so the drawing above is what that generator returns when it is asked for this one and given nothing else.

11 essays call it. Every call below passes it something, because a placement that passes nothing draws whichever member of the family the generator happens to default to rather than the one its essay argues about.

Where it is called

Changing this changes every one of these figures.

Only one of a grid's five parameters changes the map. The same ground point written on the British National Grid and on UTM zone 31N, with the difference between the two coordinate pairs taken apart. The largest term by four orders of magnitude is where the two grids put zero — 5544 km, being a different central meridian, a different true origin and different false constants, all of which move every coordinate and no distance. The datum, which is the term everybody names, moves the ground 106 m. And the whole geometric difference between two transverse Mercators is their scale factors — 0.9996012717 against 0.9996 — which at this point is 50 cm. Four of a grid's five parameters are bookkeeping; the fifth is the map. Grids, and what a survey does

What a grid is made of

A projected coordinate declares five things — a datum, a projection, its parameters, a unit and an axis order — and four of them are invisible in the numbers. Every one has a documented case of being guessed wrong, and the cheapest of those cost a hundred metres.

What a grid of one's own is worth. For every candidate central meridian, the best worst-case distortion achievable over the region once the scale factor has also been optimised — so each point on the curve is already the bottom of its own V. The minimum is at 2.9°W with k₀ = 0.9993009, giving 700 ppm. The dashed line is UTM zone 30, whose meridian and scale factor were chosen for no region in particular, at 1059 ppm. The national grid is better by a factor of 1.51 — which is the whole of the answer to why a country publishes a grid rather than using the zones, and it is a smaller factor than the argument is usually made to sound. Grids, and what a survey does

Designing a grid for one region

A country with a grid of its own beats the international zone that would otherwise carry it by a factor of 1.51. That is worth having and it is much less than the argument is usually made to sound, and the difference between the two numbers is the whole case for and against national grids.

A grid scaled to the ground, and where it stops being one. A surface coordinate system on the British National Grid: the grid multiplied by 1.0004044, the reciprocal of the combined factor at a project origin 120 m above the ellipsoid, so that a grid distance equals a ground distance there. It is exact at the origin by construction and wrong everywhere else, and the two directions are not comparable — the axis is logarithmic across five decades. 60 km due east the set-out distance is out by 5559 mm, and the same distance due north by 20.5 mm. The scale factor of a transverse Mercator depends on the easting and almost not at all on the northing, so a system sold as good "within a few kilometres" has a useful area that is a strip rather than a circle. Grids, and what a survey does

A grid scaled to the ground is not a map

Construction sites work in coordinates where a tape reading equals a computed distance, which is achieved by multiplying the national grid by a constant. The result is exact at one point, degrades east–west forty times faster than north–south, and is not a map projection at all.

Four steps between a tape and a drawing. A slope distance of 76.895 km measured at 3.2° on ground 220 m above sea level, reduced to the British National Grid, with every step drawn on a logarithmic scale in millimetres. The slope reduction is the largest by a wide margin at 119.90 m and is the one everybody applies. The grid reduction is 30.23 m. The fourth bar is not a step at all: it is what using the levelled height where the height above the ellipsoid is wanted costs, with a geoid separation of 48.5 m — 583 mm, which is 1.9% of the grid reduction it sits beside and 29 times the tolerance the job closes to. Reading a correction's importance off its share of the chain is how it gets dropped. Grids, and what a survey does

What a tape measures

Four steps stand between an instrument reading and a coordinate, and their sizes are not in the order anybody expects. On a 77-kilometre line the slope reduction is 120 metres, the grid reduction 30, and a step nobody names — using the height above sea level where the height above the ellipsoid is wanted — is 583 millimetres.

A closed traverse cannot see a scale error. The same closed figure with two different errors in it. On the left every leg is 400 parts per million too long, which is roughly what forgetting the grid scale factor costs — and the figure closes to 2.3e-13 m, which is the last bit of a double rather than a measurement. Scaling every leg of a closed figure by the same factor produces a similar figure and a similar figure is still closed, so the check every specification leans on is blind to it. Every dimension in that figure is wrong: the perimeter is out by 1.17 m. On the right one angle is 20 seconds out — a far smaller disturbance in its own units — and the figure fails to close by 0.062 m. Closure tests the shape and says nothing about the size. Grids, and what a survey does

A traverse must close

The check every survey specification leans on cannot see the error this whole field is about. Scale every leg of a closed figure by four hundred parts per million and it closes to the last bit of a double, while every dimension in it is wrong.

Two conventions, and neither of them finds the blunder. A blunder of 350 mm added to leg 3 of a closed traverse, producing a misclosure of 350 mm — one part in 8344, which most specifications would accept. Bowditch's rule shares the misclosure out in proportion to leg length; the Transit rule shares it in proportion to each leg's component along the axis being corrected. Both close the figure exactly, so both are valid; they disagree with each other by up to 14 mm; and neither puts more than 104 mm of correction on the leg that is actually wrong. A rule for distributing a misclosure is a convention for producing consistent numbers, and it is not an instrument for finding errors. Grids, and what a survey does

The two ways to spread a misclosure

Bowditch's rule and the Transit rule take the same closed figure and the same misclosure and disagree about which legs were wrong. Both close it exactly, neither puts the correction on the leg that actually carries the blunder, and no measurement can settle which is right.

Only one of a grid's five parameters changes the map. The same ground point written on the British National Grid and on UTM zone 31N, with the difference between the two coordinate pairs taken apart. The largest term by four orders of magnitude is where the two grids put zero — 5544 km, being a different central meridian, a different true origin and different false constants, all of which move every coordinate and no distance. The datum, which is the term everybody names, moves the ground 106 m. And the whole geometric difference between two transverse Mercators is their scale factors — 0.9996012717 against 0.9996 — which at this point is 50 cm. Four of a grid's five parameters are bookkeeping; the fifth is the map. Grids, and what a survey does

Two grids over the same ground

One point in the English Midlands is 406,788 east on the British grid and 167,478 east on UTM. Separating the difference properly leaves a surprise — only one of a grid's five parameters changes the map, and it is not any of the four that dominate the number.

Which corrections a 10 mm job may leave out. Each correction inverted: the line length — or, for the last row, the patch radius — at which that correction alone reaches 10 mm, for a job 150 m above the ellipsoid on 2° of ground, 0.0° from the British National Grid's central meridian. The tightest is the slope reduction at 16 m. Three of the four rows are linear in the tolerance, so this ranking is the same at a millimetre and at a decimetre; what does change it is the site — move the job up a mountain or onto steeper ground and the order is different, which is why a specification's list is not transferable. Grids, and what a survey does

The tolerance decides the model

Every correction inverts to a distance — the line length at which it alone exceeds a stated tolerance. The ranking those distances produce is the same at a millimetre and at a decimetre, and it is different for two jobs at the same tolerance on different ground.

A published coordinate is a definition being quoted. Re-observing a control point perfectly, with an instrument good to 20 mm, and comparing the answer to what is published for it. The published coordinate was fixed on a datum realisation that has since been superseded, which accounts for 106 m, and the ground it marks has moved 750 mm in 30 years at 25 mm a year. Both numbers are larger than the observation and neither is an error in it: subtracting a published coordinate from an observed one measures the interval between two definitions. Grids, and what a survey does

A published coordinate is a result

Re-observe a control mark perfectly, with an instrument good to twenty millimetres, and the answer disagrees with the published value by a hundred metres. Neither number is wrong. The difference measures the interval between two definitions.

What a 20 mm closure tolerance lets each station hide. A closed traverse of seven stations in plan, each labelled with the angle blunder that would leave the closure inside a 20 millimetre tolerance. An angle error at a station rotates everything downstream of it about that station, so the closing point moves by the distance from the station to the close — and the last station before the close stands 72 metres from it and can hide 57 arcseconds, against 2.1 at the worst-placed station. The check is not insensitive; it is unevenly sensitive, and nothing in the specification says so. Grids, and what a survey does

What a closed figure cannot see

A closed traverse imposes exactly two conditions on its observations, so everything else is free — and the freedom is not spread evenly. At a twenty-millimetre tolerance the worst-placed station in a seven-station loop hides an angle blunder of 2.1 arcseconds and the station standing seventy-two metres from the close hides 57, because a rotation about a point near the finish moves the finish hardly at all.

Two routes to one grid distance, 76.7 kilometres apart. The first four bars are the tape's chain: the chord between two marks, the height difference taken off it, the reduction to the ellipsoid, and the projection's own scale applied. The last is the satellite route — project both marks and subtract — which needs none of those steps because the observation already contains the positions the chain exists to supply. They agree to 0.17 millimetres, and that agreement is what makes the chain checkable at all: two routes to one number, sharing no arithmetic. Grids, and what a survey does

The chain the satellite does not have

The four-step reduction from a tape reading to a grid coordinate exists because a tape does not know where it is. A satellite observation does, so the same distance can be got by projecting both ends and subtracting — and the two answers agreeing to a fifth of a millimetre is the first check the chain has ever had.

The whole library