Figure

The two reductions, at a grid factor of 1.0004

Drawn here at the parameters it defaults to, with every essay that calls it.
The two reductions, at a grid factor of 1.0004. A measurement made on the ground has to be brought to the ellipsoid and then to the grid, and the two corrections have opposite signs. The elevation factor is R/(R+h) and always shrinks; the grid factor here is 1.0004, which stretches. Their product is the only number a surveyor can use. They cancel exactly at 2551 metres. At 1500 metres the combined factor is 165 parts per million, which is 1.65 metres on a 10 kilometre baseline.

A measurement made on the ground has to be brought to the ellipsoid and then to the grid, and the two corrections have opposite signs. The elevation factor is R/(R+h) and always shrinks; the grid factor here is 1.0004, which stretches. Their product is the only number a surveyor can use. They cancel exactly at 2551 metres. At 1500 metres the combined factor is 165 parts per million, which is 1.65 metres on a 10 kilometre baseline.

It is drawn by height-figure with show: "combined-factor" — one member of a family of 8 figures that share a generator, so the drawing above is what that generator returns when it is asked for this one and given nothing else.

6 essays call it. Every call below passes it something, because a placement that passes nothing draws whichever member of the family the generator happens to default to rather than the one its essay argues about.

Where it is called

Changing this changes every one of these figures.

Three surfaces, and the two heights between them. The ellipsoid, the geoid and the ground, with the two heights a coordinate can carry. Ellipsoidal height h is what a satellite fix returns and is measured from a surface defined by four constants. Orthometric height H is what a level and a staff measure and is referred to the geoid — the equipotential surface that best fits mean sea level. They differ by the separation N, drawn here as 45 metres because that is a stated input rather than a computed one: a geoid model is a data product with a truncation degree in it, and this site computes rather than downloads. The arithmetic h = H + N is exact whatever N is. What the numbers refer to

Height above what?

A satellite reports a height above a mathematical surface. A level and a staff report a height above the surface water settles on. The two disagree by tens of metres, both are correct, and only one of them decides which way a pipe drains.

Four steps between a tape and a drawing. A slope distance of 76.895 km measured at 3.2° on ground 220 m above sea level, reduced to the British National Grid, with every step drawn on a logarithmic scale in millimetres. The slope reduction is the largest by a wide margin at 119.90 m and is the one everybody applies. The grid reduction is 30.23 m. The fourth bar is not a step at all: it is what using the levelled height where the height above the ellipsoid is wanted costs, with a geoid separation of 48.5 m — 583 mm, which is 1.9% of the grid reduction it sits beside and 29 times the tolerance the job closes to. Reading a correction's importance off its share of the chain is how it gets dropped. Grids, and what a survey does

What a tape measures

Four steps stand between an instrument reading and a coordinate, and their sizes are not in the order anybody expects. On a 77-kilometre line the slope reduction is 120 metres, the grid reduction 30, and a step nobody names — using the height above sea level where the height above the ellipsoid is wanted — is 583 millimetres.

Why a levelled height is not a distance. The correction between raw levelling and orthometric height, for lines at 200, 500, 1000, 2000 metres above the geoid running north from 50°. It is not instrument error: level surfaces converge towards the pole, so a run that stays on one of them gains height relative to another. A line 2000 metres up reaches 647 millimetres over 400 kilometres. The dashed line is 10 millimetres, which is about what a first-order levelling network closes to over that distance — so this is not a refinement, it is the larger of the two numbers. What the numbers refer to

A levelled height is not a distance

Level surfaces converge towards the poles by five metres in a thousand, so a chain of perfectly executed levelling observations does not sum to a height difference. The correction over four hundred kilometres of northing is larger than the network's own closure.

The two reductions, at a grid factor of 1.0004. A measurement made on the ground has to be brought to the ellipsoid and then to the grid, and the two corrections have opposite signs. The elevation factor is R/(R+h) and always shrinks; the grid factor here is 1.0004, which stretches. Their product is the only number a surveyor can use. They cancel exactly at 2551 metres. At 1500 metres the combined factor is 165 parts per million, which is 1.65 metres on a 10 kilometre baseline. What the numbers refer to

The ground is not the grid

A tape measure on a hillside has to be brought down to the ellipsoid and then out onto the map, and the two corrections have opposite signs. On a grid whose scale factor exceeds one there is exactly one elevation where they cancel — 2,551 metres, for a factor of 1.0004.

A 1-hectare parcel across British National Grid, at 52°N. The departure of a plan's dimensions from the ground's, across the width of the zone, as a length and as an area. The area curve is the length curve doubled — an areal scale factor is the square of a linear one, and squaring a small departure doubles it — so a parcel whose sides are each 399 parts per million short on the central meridian is 797 short in area. On a 1-hectare parcel that is 8.0 square metres at the central meridian and 8.0 at 0.00° out. Grids, and what a survey does

An area on the grid is not an area on the ground

A grid's scale factor is a property of lengths and what a surveyor sells is an area. Squaring a departure doubles it, so a hectare drawn on the British grid at its central meridian has 10,008 square metres of ground under it — and correcting an area with the line factor instead of its square leaves half the error behind.

Two routes to one grid distance, 76.7 kilometres apart. The first four bars are the tape's chain: the chord between two marks, the height difference taken off it, the reduction to the ellipsoid, and the projection's own scale applied. The last is the satellite route — project both marks and subtract — which needs none of those steps because the observation already contains the positions the chain exists to supply. They agree to 0.17 millimetres, and that agreement is what makes the chain checkable at all: two routes to one number, sharing no arithmetic. Grids, and what a survey does

The chain the satellite does not have

The four-step reduction from a tape reading to a grid coordinate exists because a tape does not know where it is. A satellite observation does, so the same distance can be got by projecting both ends and subtracting — and the two answers agreeing to a fifth of a millimetre is the first check the chain has ever had.

The whole library